Date: 02/12/2004 Views: 3320
Date: 07/04/2004 Views: 3739
Date: 05/25/2008 Views: 3174
Date: 08/23/2023 Views: 202302
The area where the tie bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.