Date: 11/01/2009 Views: 3632
Date: 07/09/2006 Views: 3507
Date: 11/02/2005 Views: 3425
Date: 08/23/2023 Views: 218159
The area where the tie bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.