Date: 12/31/1969 Views: 2752
Date: 04/15/2006 Views: 2876
Date: 04/26/2008 Views: 2278
Date: 08/23/2023 Views: 182276
The area where the tie bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.