Date: 02/07/2010 Views: 3104
Date: 11/05/2006 Views: 3066
Date: 03/11/2007 Views: 2711
Date: 08/23/2023 Views: 203424
The area where the tie bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.