Date: 09/01/2007 Views: 3475
Date: 01/17/2006 Views: 4394
Date: 09/05/2005 Views: 2668
Date: 08/23/2023 Views: 188172
The area where the tie bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.