Date: 08/15/2010 Views: 3184
Date: 12/31/2008 Views: 3282
Date: 11/23/2010 Views: 2703
Date: 08/23/2023 Views: 160455
The area where the tie bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.