Date: 07/29/2007 Views: 2555
Date: 10/07/2007 Views: 3612
Date: 06/06/2003 Views: 3048
Date: 08/23/2023 Views: 160267
The area where the tie bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.