Date: 10/24/2010 Views: 3708
Date: 06/19/2009 Views: 3555
Date: 11/10/2010 Views: 5795
Date: 08/23/2023 Views: 196533
The area where the tie bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.