Second and final pass of Port top wingskin bond on 7.
Date: 09/13/2010
Views: 3406
Cooling and Garmin 296 GPS antenna placement.
Date: 02/07/2010
Views: 4030
Newest Image
EAA SITE
Date: 08/23/2023
Views: 207578
WingSet98Ann
Started the installation of the flap operating cross tube by drilling a pair of holes on each side of the fuselage where the cross tube will eventually emerge to engage the flap operating pins. The port side preliminary openings for the flap operating cross tube.