|
nex_2014_01_25_01
Starboard side after Uni over ribs 3 and 4. Added Bid on the X to reinforce the cuts needed to get the Uni to lay flat. Also filled in Rib 1 air buble.
Date: 01/25/2014
Views: 6645
|
|
nex_2014_01_25_02
Starboard side of the air bubble fix on rib one. Used Flox with aeroboxy as a fillit.
Date: 01/25/2014
Views: 6831
|
|
nex_2014_01_25_03
Port side dirty work. Just test fitting final install with all hardware will be after the legs are painted.
Date: 01/25/2014
Views: 6993
|
|
nex_2014_01_25_04
Bill helping hoist the aircraft up to remove the jig.
Date: 01/25/2014
Views: 6946
|
|
nex_2014_01_25_05
My lovely bride helping us out. Notice the jig is the mono wheel trailer.
Date: 01/25/2014
Views: 6925
|
|
nex_2014_01_25_06
Mains on the ground for the first time.
Date: 01/25/2014
Views: 6771
|
|
nex_2014_01_25_07
What a mess.
Date: 01/25/2014
Views: 6843
|
|
nex_2014_01_25_15
Doing mod 59.
Date: 01/25/2014
Views: 6604
|
|
nex_2014_01_25_16
nex_2014_01_25_16.jpg
Date: 01/25/2014
Views: 6865
|
|
nex_2014_01_25_17
Rolled out on the grass. Notice the tail wheel is still there. I left it in due to not having the stacks of cash to hold the nose down.
Date: 01/26/2014
Views: 7007
|