|
dsc08962
Stb side. Need to do some clean up...
Date: 10/01/2012
Views: 11651
|
|
dsc08967
Little clean up required on Port side.
Date: 10/01/2012
Views: 10032
|
|
dsc08965
Port side after layups and peel ply removed. Notice shape of hole for the angle of the LG socket. I wrapped the LG socket with sandpaper and used it to form the hole.
Date: 10/01/2012
Views: 10156
|
|
dsc08966
Port side LG socket hole.
Date: 10/01/2012
Views: 10864
|
|
dsc08963
Port side. LG socket fitting.
Date: 10/01/2012
Views: 9883
|
|
dsc08964
Port side. Fitting of LG socket.
Date: 10/01/2012
Views: 9637
|
|
dsc09021
BIG THANK YOU to my Uncle Kim Prout for flying out to help me with getting the gear legs set. He also helped me slow down and plan ahead. As an excited new builder its easy to get in a rush to try achieve something tangible. Im sure after that week of b
Date: 01/22/2013
Views: 8781
|
|
dsc09018
Started to make the axle jig. Used a simple setup of first taking large flat blocks of wood and caulking it to the floor somewhere over FS70. Then that allows me to fix the aluminum angle with a single screw once in its final position.
Date: 01/10/2013
Views: 9826
|
|
dsc09022
Here you see I used bondo on the shims and screwed them down into the block. The shims made sure the guide was level. Also note the hole drilled in the Aluminum angle and the shim. This is where I fixed the guide for the curing stage to ensure nothing
Date: 01/22/2013
Views: 9238
|
|
dsc09019
Trash can is the best way to hold the landing gear legs.
Date: 01/10/2013
Views: 8556
|