Date: 02/08/2010 Views: 4265
Date: 12/31/1969 Views: 2457
Date: 12/31/1969 Views: 3675
Date: 08/23/2023 Views: 82129
The area where the tie bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.