Date: 09/11/2009 Views: 2775
Date: 10/31/2007 Views: 2429
Date: 04/15/2012 Views: 6591
Date: 08/23/2023 Views: 82061
The area where the tie bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.