Ultimate ventilator installation and associated repair 11.
Date: 07/12/2009
Views: 2678
010702_petotube_mount
Date: 12/31/1969
Views: 2509
Tri gear with wings under fuse Bob.
Date: 09/14/2010
Views: 3143
Newest Image
EAA SITE
Date: 08/23/2023
Views: 81863
IMG_0397Ann
2008 08 04 - Back from a week at KOSH. Fabulous as usual. Maybe get some pics posted later this week. Waiting on a push-button to arrive from ACS so I can complete the starter circuit rebuild. Also waiting for my Fed Ex shipment of goodies purchased at KOSH to arrive. Meanwhile, laid up two baggage bay access covers. Two plies of BID, a 1/8" sheet of rigid foam & two plies of BID. Faced on both sides with peel ply to take up any extra resin. Return to work tomorrow so back to evenings, Friday, Saturday & Sunday work. BTW, no joy so far on getting TLR46a to talk to the turbo contoller.