Date: 06/04/2005 Views: 2611
Date: 04/03/2010 Views: 2610
Date: 09/16/2007 Views: 2509
Date: 08/23/2023 Views: 81870
I cleaned up the inside and outside of the tie-bar, cut to proper length and sanded the ends so the sockets now fit. Alan did a first pass 36 grit sanding of the tunnel. Y10-11-09