Date: 01/03/2010 Views: 2510
Date: 04/07/2006 Views: 2825
Date: 11/04/2009 Views: 2785
Date: 08/23/2023 Views: 81869
Date: 05/23/2007 Views: 531034
The hinge areas were scuff sanded in preparation for the layups. A small batch of expoxy was mixed with FLOX. This was applied to the area of the upper hinge where a flange area has been ground flat.