This is starboard side conduit being installed.
First we made a green masking tape hinge holding conduit in precise location but allowing us to open up and wet out 5 inches of lower seam, (above front lift pin strengthening).
Then we wet out seam with Aeropoxy / 30 minute, floxed and here we are installing 2 plies of thin model aeroplane cloth 1.50" x 5".
Y10-08-12