|
p1000716
p1000716.jpg
Date: 03/12/2012
Views: 6262
|
|
|
E2
Date: 10/05/2012
Views: 11884
|
|
|
nex_2014_01_12_01
Bolt hole for LG port side filed to size.
Date: 01/13/2014
Views: 6596
|
|
|
20141102_154450
Gear cover removed, now for removing the throttle box. This is all prep work to patch up the mono wheel hole.
Date: 11/02/2014
Views: 15337
|
|
|
nex_2014_01_12_07
Port side.
Date: 01/13/2014
Views: 6761
|
|
|
NEX_2013-11-12-37
N111EU at rest.
Date: 11/13/2013
Views: 30253
|
|
|
dsc08633
We had to put the plane somewhat down near the trailer with the main up so that we could get the right contour for the ribs. Reminds me of a B-17 with the main just showing.
Date: 04/14/2012
Views: 6997
|
|
|
dsc08606
Old mass balance arm.
Date: 04/10/2012
Views: 9459
|
|
|
dsc08642
From the start the airframe was sitting 2.5 deg tail low and 0.1 deg to port. Not bad for just putting her on there. I jacked up the back of the trailer to get it as near to 0.0 as possible and also shifted the airframe latterly to turn that .1 to 0.0 a
Date: 04/15/2012
Views: 10515
|
|
|
dsc08619
Roap tied to the engine mount frame to hoist the airframe.
Date: 04/14/2012
Views: 14327
|
|
|
dsc09075
Stbd side after cure. We died the uni in with rib 1.
Date: 01/26/2013
Views: 8034
|
|
|
photo (1)
Bad pic, but shows the end of the reinforcement layups (port side).
Date: 08/20/2012
Views: 11887
|
|
|
photo (2)
Small area to work in. Back was killing me after that job. can't wait to give my back the same treatment when doing the ribs and starboard side.
Date: 08/20/2012
Views: 12701
|
|
|
dsc08622
Removed.
Date: 04/14/2012
Views: 15304
|
|
|
p1000691
p1000691.jpg
Date: 03/12/2012
Views: 5879
|
|
|
p1000698
p1000698.jpg
Date: 03/12/2012
Views: 6713
|
|
|
dsc09046
Making a layup schedule for rib 1.
Date: 01/23/2013
Views: 7878
|
|
|
dsc09050
Stbd. side ready for the bid.
Date: 01/24/2013
Views: 7223
|
|
|
p1000725
p1000725.jpg
Date: 03/12/2012
Views: 6490
|
|
|
dsc09027
Mixing that expensive 420.
Date: 01/22/2013
Views: 7562
|
|