Date: 09/07/2009 Views: 4479
Date: 10/28/2013 Views: 5669
Date: 05/17/2004 Views: 2814
Date: 08/23/2023 Views: 129617
The area where the tie bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.