Gearbox friction torque, when and how and it's mandatory!
Date: 08/19/2010
Views: 3474
DSCN6566
Date: 10/25/2009
Views: 3885
Newest Image
EAA SITE
Date: 08/23/2023
Views: 714453
WingSet98Ann
Started the installation of the flap operating cross tube by drilling a pair of holes on each side of the fuselage where the cross tube will eventually emerge to engage the flap operating pins. The port side preliminary openings for the flap operating cross tube.