Front Starboard fuse stiffening for lift socket 6.
Date: 10/24/2010
Views: 7591
DSCN5419Ann
Date: 12/29/2006
Views: 5228
Newest Image
EAA SITE
Date: 08/23/2023
Views: 807479
Most Viewed Image
EAA SITE
Date: 08/23/2023
Views: 807479
Tie-bar 68.
All parts are now painted with two coats of Epoxy.
There is a 1500 watt heater under the stabilator torque tube not only cooking the paint, but keeping the tent warm, (where the two 2 BID repairs are located inside the fuse).
Y10-11-21