Date: 12/31/1969 Views: 3789
Date: 06/13/2010 Views: 3177
Date: 02/19/2004 Views: 2801
Date: 08/23/2023 Views: 159541
WingSet96Ann The area where the tie-bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.