Date: 10/26/2009 Views: 3431
Date: 10/31/2007 Views: 5720
Date: 04/09/2007 Views: 4101
Date: 08/23/2023 Views: 160658
I cleaned up the inside and outside of the tie-bar, cut to proper length and sanded the ends so the sockets now fit. Alan did a first pass 36 grit sanding of the tunnel. Y10-11-09