Vertical upright, swing-arm and generator install 3 of 7.
Date: 08/12/2003
Views: 5256
DSC_0058
Date: 08/31/2007
Views: 2932
Newest Image
EAA SITE
Date: 08/23/2023
Views: 207580
Tie-bar 8.
I built up the OD of the tie-bar with Duct tape to simulate 2 BID under the tie-bar, 1 wrap of Redux / BID and allowance for Redux / Flox.
Then stapled in place a piece of Peel ply.
I think I built up the OD by .060".
Y10-11-11