Date: 11/29/1999 Views: 6113
Date: 05/18/2012 Views: 6129
Date: 09/24/2005 Views: 7625
Date: 08/23/2023 Views: 704560
WingSet96Ann The area where the tie-bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.