Date: 01/09/2005 Views: 5101
Date: 11/29/1999 Views: 5714
Date: 10/29/2007 Views: 7990
Date: 08/23/2023 Views: 704272
WingSet96Ann The area where the tie-bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.