Date: 12/31/1969 Views: 3752
Date: 12/31/1969 Views: 3682
Date: 01/06/2007 Views: 4693
Date: 08/23/2023 Views: 704274
WingSet96Ann The area where the tie-bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.