Foam and Q-cel trimmed and sanded, ready for final 2 BID layup.
Getting to this point included:
**First scuff sanding the tiebar with 80 grit and laying 1 BID with Redux and peel ply on the tie-bar
**Removing the top layer of glass and foam in the central tunnel
**Q-cel and foam laid up in the central tunnel rebate using installed tie-bar to insure close to what is needed placement
**Cleaning up foam and Q-cel in rebate and laying up 2 BID into central tunnel rebate
**Cleaning up above 2 BID layup
**Digging out foam on the sides of the central tunnel and filling with Flox and laying up 2 BID with peel ply
**Cleaning up above 2 BID layup
**Redux / Floxing in place tie-bar, using custom Peel ply dams for ends and filling top gaps and peel plying
**Cleaning up Redux / Flox from above step
**After wetting out and Floxing, 2 BID over tie-bar with Aeropoxy / 30 minute, when it tacked up Q-celled in place two plies of foam
**Cleaned up above layup and foam
**Then the final 2 BID layup with peel ply.
Y10-12-01