2 channel dimmable ceiling LED wiring schematic complete.
Date: 03/01/2009
Views: 3100
DSCN5598Ann
Date: 03/05/2007
Views: 3385
Dave Anderson.
Date: 09/02/2010
Views: 3572
Newest Image
EAA SITE
Date: 08/23/2023
Views: 161351
Rudder_stops_8
Went after 7075 bar with Kalamazoo bandsaw in my home, then a crappy 2" beltsander I just picked up from Sears to keep at hangar (have a 1" and 6" beltsander at home, but carrying stop back and forth would be a pain), then permagrit, then hand files and finished for now with sandpaper.
The two mounting holes were drilled undersized (.246").
3M 375 packaging tape was put on tailwheel horn, stop was clamped in place, then JB KWIK welded in position.
drilled through with .246" drill, then stepped up to .250" drill for a nice fit.
Y9-05-27