Port front tang rebate prepared for closing gap a bit.
Date: 10/16/2009
Views: 2589
The magic number is 1.990" from the forward pillow block bearing to the grove.
Date: 12/13/2013
Views: 3730
DSCN6508
Date: 10/25/2009
Views: 2248
Newest Image
EAA SITE
Date: 08/23/2023
Views: 84396
Door sill conduit run 8.
Both conduits cleaned up and we wet out with Aeropoxy / 30 minute and 75% filled areas that needed with flox.
The idea is once this first pass tacks up will wet out again, flox 100% and lay up 1 BID.
Y10-08-10