Vertical upright, swing-arm and generator install 3 of 7.
Date: 08/12/2003
Views: 5050
DSC_0058
Date: 08/31/2007
Views: 2818
Pump_3
Date: 03/21/2009
Views: 2681
Newest Image
EAA SITE
Date: 08/23/2023
Views: 160174
InstrumentPanel36Ann
Put connectors on the ends of the Tachometer output wires from the TCU. Ring terminal on #13 and attached it to the ground buss. Male slip-connector on #26 to connect to EIS.