Date: 10/30/2005 Views: 3638
Date: 10/06/2011 Views: 6692
Date: 04/25/2006 Views: 6230
Date: 08/23/2023 Views: 767321
The area where the tie bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.