Date: 12/31/1969 Views: 3995
Date: 09/19/2010 Views: 6613
Date: 03/06/2007 Views: 4513
Date: 08/23/2023 Views: 747079
The area where the tie bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.