Date: 05/02/2006 Views: 29200
Date: 01/23/2006 Views: 3857
Date: 05/05/2009 Views: 6436
Date: 08/23/2023 Views: 704264
The area where the tie bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.