Date: 04/07/2006 Views: 4353
Date: 04/17/2004 Views: 2041
Date: 10/23/2010 Views: 3150
Date: 08/23/2023 Views: 82543
The area where the tie bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.