Date: 06/08/2011 Views: 5117
Date: 09/28/2005 Views: 4655
Date: 08/31/2007 Views: 6130
Date: 08/23/2023 Views: 820088
The area where the tie bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.