Date: 08/03/2003 Views: 6026
Date: 10/01/2009 Views: 6256
Date: 06/26/2009 Views: 8631
Date: 08/23/2023 Views: 704283
The area where the tie bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.