Date: 03/15/2009 Views: 3240
Date: 12/31/1969 Views: 3649
Date: 10/11/2009 Views: 2817
Date: 08/23/2023 Views: 166967
The area where the tie bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.