Date: 11/05/2006 Views: 2861
Date: 02/11/2004 Views: 3201
Date: 01/06/2004 Views: 3452
Date: 08/23/2023 Views: 104536
The area where the tie bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.