Date: 07/12/2010 Views: 2803
Date: 12/31/1969 Views: 2959
Date: 04/21/2007 Views: 2637
Date: 08/23/2023 Views: 103688
The area where the tie bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.