Date: 04/10/2009 Views: 19186
Date: 06/14/2008 Views: 3044
Date: 12/31/1969 Views: 2813
Date: 08/23/2023 Views: 205467
The area where the tie bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.