Date: 12/25/2013 Views: 5603
Date: 06/13/2010 Views: 3579
Date: 04/11/2009 Views: 3217
Date: 08/23/2023 Views: 195997
The area where the tie bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.