Date: 04/29/2003 Views: 4845
Date: 10/03/2003 Views: 5190
Date: 04/17/2005 Views: 2979
Date: 08/23/2023 Views: 172697
The area where the tie bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.