Date: 01/29/2012 Views: 9260
Date: 10/25/2009 Views: 2562
Date: 09/01/2010 Views: 3681
Date: 08/23/2023 Views: 165906
The area where the tie bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.