Date: 03/22/2004 Views: 3701
Date: 04/08/2007 Views: 2949
Date: 04/19/2007 Views: 2939
Date: 08/23/2023 Views: 88063
The area where the tie bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.