Date: 06/05/2011 Views: 3020
Date: 01/23/2006 Views: 3434
Date: 10/31/2005 Views: 3786
Date: 08/23/2023 Views: 193901
The area where the tie bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.