Date: 02/22/2014 Views: 5831
Date: 12/31/1969 Views: 4531
Date: 12/31/1969 Views: 2645
Date: 08/23/2023 Views: 209890
The area where the tie bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.