Date: 04/03/2010 Views: 2793
Date: 05/06/2008 Views: 3509
Date: 12/31/1969 Views: 2830
Date: 08/23/2023 Views: 195919
The area where the tie bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.