Date: 04/16/2005 Views: 2671
Date: 12/31/1969 Views: 3272
Date: 12/31/1969 Views: 2913
Date: 08/23/2023 Views: 164616
The area where the tie bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.