Date: 03/03/2004 Views: 3852
Date: 06/08/2008 Views: 4810
Date: 08/09/2007 Views: 3478
Date: 08/23/2023 Views: 184048
The area where the tie bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.