Date: 12/31/1969 Views: 4616
Date: 01/23/2006 Views: 2787
Date: 08/25/2009 Views: 3288
Date: 08/23/2023 Views: 204899
The area where the tie bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.