Date: 06/28/2008 Views: 2985
Date: 07/29/2008 Views: 3244
Date: 12/23/2012 Views: 9404
Date: 08/23/2023 Views: 186124
The area where the tie bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.