Date: 06/07/2007 Views: 3339
Date: 12/31/1969 Views: 3868
Date: 10/20/2010 Views: 4059
Date: 08/23/2023 Views: 205034
The area where the tie bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.