Date: 03/03/2005 Views: 3568
Date: 04/26/2008 Views: 2276
Date: 12/31/1969 Views: 2316
Date: 08/23/2023 Views: 196712
The area where the tie bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.