Date: 10/21/2007 Views: 2810
Date: 12/31/1969 Views: 2317
Date: 01/11/2005 Views: 3369
Date: 08/23/2023 Views: 174607
The area where the tie bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.