Date: 01/10/2009 Views: 4166
Date: 08/18/2009 Views: 8580
Date: 03/25/2009 Views: 3591
Date: 08/23/2023 Views: 159483
The area where the tie bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.