Date: 08/20/2010 Views: 4186
Date: 02/18/2007 Views: 3261
Date: 08/10/2004 Views: 2360
Date: 08/23/2023 Views: 200648
The area where the tie bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.